PRC-004-6 Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC-004-6. 3. Purpose: Identify and correct the causes of Misoperations of Protection Systems for Bulk Electric System (BES) Elements. 4. Applicability: Functional Entities: Transmission Owner Generator Owner distribution Provider Facilities: Protection Systems for BES Elements, with the following exclusions: Non-protective functions that are embedded within a Protection System .
• The Transmission Owner, Generator Owner, and Distribution Provider shall retain evidence of Requirement R6, Measure M6 for a minimum of 12 calendar months following completion of each CAP. If a Transmission Owner, Generator Owner, or Distribution Provider is found non-compliant, it shall keep information related to the non-compliance until
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}