PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

PRC-027-1 — Coordination of Protection Systems for ...

PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To maintain the Coordination of Protection Systems installed to detect and isolate Faults on Bulk Electric System (BES) Elements, such that those Protection Systems operate in the intended sequence during Faults. 4. Applicability: Functional Entities: Transmission Owner Generator Owner Distribution Provider (that owns Protection Systems identified in the Facilities section below) Facilities: Protection Systems installed to detect and isolate Faults on BES Elements. 5. Effective Date: See the Implementation Plan for PRC-027-1 , Project 2007-06 System Protection Coordination . B. Requirements and Measures R1.

Standard for Electrical Power System Device Function Numbers, Acronyms, and Contact Designations. PRC-027-1 Supplemental Material . Page 8 of 18 . Purpose . The Purpose states: To maintain the coordination of Protection Systems installed to detect and

Tags:

  Functions

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of PRC-027-1 — Coordination of Protection Systems for ...

Related search queries