PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

PRC-027-1 — Coordination of Protection Systems for ...

PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To maintain the Coordination of Protection Systems installed to detect and isolate Faults on Bulk Electric system (BES) Elements, such that those Protection Systems operate in the intended sequence during Faults. 4. Applicability: Functional Entities: Transmission Owner Generator Owner Distribution Provider (that owns Protection Systems identified in the Facilities section below) Facilities: Protection Systems installed to detect and isolate Faults on BES Elements. 5. Effective Date: See the Implementation Plan for PRC-027-1 , Project 2007-06 system Protection Coordination . B. Requirements and Measures R1. Each Transmission Owner, Generator Owner, and Distribution Provider shall establish a process for developing new and revised Protection system settings for BES Elements, such that the Protection Systems operate in the intended sequence during Faults.

A review of the developed Protection System settings. 1.3. For Protection System settings applied on BES Elements that electrically join Facilities owned by separate functional entities (Transmission Owners, Generator Owners, and Distribution Providers), provisions to: 1.3.1. Provide the proposed Protection System settings to the owner(s) of the

Tags:

  System

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of PRC-027-1 — Coordination of Protection Systems for ...

Related search queries