Transcription of Pre-Engineered Walk-In Coolers and Freezers …
{{id}} {{{paragraph}}}
Pre-Engineered Walk-In Coolers and Freezers installation manual Part One: The Bally Walk-In 1. Preparation for Installing the Walk-In_____ 3. 2. Operation of the Bally Speed-Lok_____ 3. Part Two: installation 1. Positioning_____ 4. 2. Walk-Ins with Screeds_____ 4. 3. Installing Less-Floor Walk-Ins_____ 4. 4. Door installation _____ 5. 5. Installing With-Floor Walk-Ins_____ 5. 6. Vertical and Ceiling Panel Installation_____ 5. 7. Installing Multi-Compartment Walk-Ins_____ 6. Part Three: Other Important Information 1. Preventing Vapor Leaks_____ 6. 2. Partition Wall Caulking _____ 7. 3. Air Gap Circulation Recommendation _____ 7. 4. Making holes for Refrigeration Tubing and Electrical Lines_____ 7. 5. Making Electrical Connections to Entrance Doors and Vapor-proof Lights_____ 7. Part Four: Completing the Bally installation Completing installation of the Walk-In_____ 9. 1-800-24 BALLY | UPDATED: 4/2017 Instruction manual IM-268-11 2017 Bally Refrigerated boxes , Inc.
Pre-Engineered Walk-In Coolers and Freezers Installation Manual UPDATED: 4/2017 Instruction Manual IM-268-11 2017© Bally Refrigerated Boxes, Inc. 1 Part One: The Bally Walk-In 1. Preparation for Installing the Walk-In_____ 3
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}