Prerequisite and Induction Requirements

Procedure Prerequisite and Induction Requirements HSES. 6 March 2019. 100-PR-SA-1026. 100-TE-DC-0005_0. Prerequisite and Induction Requirements Page 2 of 20. 100-PR-SA-1026_11. Disclaimer: This document is protected by copyright; no part of this document may be reproduced or adapted without the consent of the originator/company owner, all rights are reserved. This document is uncontrolled when printed , refer to electronic copy for up to date version. Induction Requirements 100-PR-SA-1026. Revision Number 11. 6/03/2019. Status IFU - ISSUED FOR USE. Author Jacqueline Willox 6/03/2019. Signature Checked (or Squad Review Megan Maclean 6/03/2019. #). Signature Approved Rob Watson 6/03/2019. Signature Yes FORTESCUE STAFF &. Confidentiality Publish on Extranet CONTRACTORS No Review Date 6/03/2022. Revision History (to be completed for each version retained by Document Control). Rev Author Checker Approver Status Issued Date No. Toni Davey FMG-SQ-00587 Rob Watson 0 IFU 8/10/2012.

construction sites or other areas controlled by Fortescue Metals. ROLES AND ACCOUNTABILITIES Table 1: Key Accountabilities Role Responsibility Area Managers / Supervisors • Ensure all personnel working in their area of authority are inducted as per this procedure Induction Trainers • Ensure that inductions are delivered in full using the

Tags:

  Requirements, Construction, Induction, Prerequisites, Prerequisite and induction requirements

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Prerequisite and Induction Requirements

Related search queries