Transcription of PROJECT PROCEDURE MANUAL
{{id}} {{{paragraph}}}
BUREAU OF PRE-CONSTRUCTION. PROJECT PROCEDURE MANUAL . 2017 EDITION INSTRUCTIONS TO DESIGN PROFESSIONALS. UNDER AGREEMENT WITH THE. DEPARTMENT OF GENERAL SERVICES. DEPARTMENT OF GENERAL SERVICES. ARSENAL BUILDING, 1800 HERR STREET. HARRISBURG, PENNSYLVANIA 17103. TELEPHONE: (717) 787-6200. 2017 EDITION PREFACE. This Bureau of Pre-Construction ( BOPC') PROJECT PROCEDURE MANUAL ( MANUAL ') presents current procedural information relating to the sequencing and detail of the Design Professionals' activities under contract with the Department of General Services ( DGS'). Activities are explained sequentially through design, bidding and construction stages. The Bureau of Construction ( BOC') Administrative procedures describes, in greater detail, the Professionals' construction administration procedures and responsibilities. It is essential that all individuals representing the Design Professional, including consultants, become thoroughly acquainted with this MANUAL 's contents to best ensure that Design Submissions meet the detailed requirements for approval by DGS.
PROJECT PROCEDURE MANUAL 1-1 PROJECT ADMINISTRATION CHAPTER 1 PROJECT ADMINISTRATION SECTION 100 - INTRODUCTION 100.1 MANUAL’S PURPOSE. The Bureau of Pre-Construction (BOPC) Project Procedure Manual (‘the Manual’ or ‘PPM’) provides Design Professionals (‘the Professional’) with a guideline of procedures and
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}