Transcription of Public Utilities Board
{{id}} {{{paragraph}}}
CODE OF PRACTICE ON SURFACE WATER DRAINAGE Sixth Edition - Dec 2011 with amendments under Addendum No. 1 Jun 2013 II CODE OF PRACTICE ON SURFACE WATER DRAINAGE (Sixth Edition - Dec 2011) Addendum No. 1 - June 2013 This addendum shall be read in conjunction with the Code of Practice on Surface Water Drainage (Sixth Edition - Dec 2011) and shall form part of the Code of Practice. S/No. Part /Page No Amendments /corrections 1 XII Add new point Flood Protection Measures 2 XIII Add new point Integration of Adjacent Watercourses with Developments 3 XIII Add new point Integration of ABC Waters Design Features within Developments 4 XIV Replace Clause Flood Protection Measures ( Crest/ Flood barriers/ Pumped drainage system) with Submissions on Storm Water Drainage System (including Crest/Flood barriers/Pumped drainage system/ABC Waters design features) in Clause 5 XV Replace Appendix 2 Rainfall Intensity-Duration-Frequency Curv
We would like to show you a description here but the site won’t allow us.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}