RATE ANALYSIS : Mumbai Site Reinforced Concrete Works Item of Work : RCC-M20 Rate ANALYSIS for : Description : RCC M20 (1 :3) concrete in Ordinary Works ---------------------------------------- ------------------------------------- Sr. Description Qty Unit Rate Amount ---------------------------------------- ------------------------------------- ** material ** 1. 43 grade opc cement i/c wastage bags 2. River sand i/c 20% wastage 3. Metal-1 of size 10mm 4. Metal no 1 of size 20mm i/c 5% wastage 5. Water for mixing & curing Total of material [M] : Rs.
Sr.No. Material Code Material Description Qty Basic unit Rate Amount 1. Cement 43 grade opc cement i/c 2.5% 1918.000 bags 240.00 460320.00