Transcription of Regenerative Blower IOM - 4-13-2015 - all-star …
{{id}} {{{paragraph}}}
OPERATION/MAINTENANCE. INSTRUCTIONS. Regenerative Blower . Registered and approved by one or more of these standards agency CE ISO RoHS. 9001 Compliant All-StarTM HBTM Series and BigBertha Blower TM Are registered trade marks of All-StarProducts. Sample Installation Layout Pressure Typical Pressure ReliefValve Pressure Gauge Arrangement Vent Check Line Valve 3 pipe diameters 3 pipe diameters Pressure +/-1 diameter +/-1 diameter System Discharge Blower Inlet Vacuum Min 2pipe Min 5pipe Filter diameters Diameters from Inlet or flowmeter Flow Meter Inlet Filter 1. Recommended piping should be one diameter larger than the inlet and outllet diameter until piping has reach the working area. 2. Due to the high discharge temperature, metal piping is recommended for the first 5 to 8 feet distance from the Blower on pressure applications. 3 Elbows increase frictional loss. Keep the number of right angle bends to a minimum. 4. Pressure relief valves should be installed in a T fitting that is at least one pipe diameter than the exhaust port diameter.
OPERATION/MAINTENANCE INSTRUCTIONS REGENERATIVE BLOWER All-StarTM HBTM Series and BigBertha BlowerTM Are registered trade marks of All-StarProducts. ISO 9001 RoHS CE Compliant Registered and approved by one or more of these standards agency
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}