Transcription of Reliability-Centered Maintenance Methodology and ...
{{id}} {{{paragraph}}}
Engineering, 2010, 2, 863-873. Published Online November 2010 ( ). Reliability-Centered Maintenance Methodology and Application: A Case Study Islam H. Afefy Industrial Engineering Department, Faculty of Engineering, Fayoum University, Al Fayyum, Egypt E-mail: Received September 15, 2010; revised September 27, 2010; accepted October 19, 2010. Abstract This paper describes the application of Reliability-Centered Maintenance Methodology to the development of Maintenance plan for a steam-process plant. The main objective of Reliability-Centered Maintenance is the cost-effective Maintenance of the plant components inherent reliability value.
the annual spare parts cost are saved when proposed preventive maintenance planning other current mainte-nance once. Based on these results, the application of the predictive maintenance should be applied. Keywords: Reliability, RCM, Preventive Maintenance, FMEA, Case Study 1. Introduction Steam system is an important part of many processing.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}