Transcription of REQUIREMENTS AND SPECIFICATIONS FOR WATER …
{{id}} {{{paragraph}}}
REQUIREMENTS AND SPECIFICATIONS . FOR. WATER DISTRIBUTION CONSTRUCTION. REVISED 10-15-2002. THE INFORMATION PROVIDED IN THIS PACKET IS TO INFORM DEVELOPERS, ENGINEERS AND OTHER INTERESTED PARTIES OF THE SPECIFICATIONS AND. STEPS NEEDED FOR WATER LINE INSTALLATION AND APPROVAL FOR SERVICE. BY THE HARVEST-MONROVIA WATER AND FIRE PROTECTION AUTHORITY. DEVELOPERS ASKING FOR WATER SERVICE ARE REQUIRED TO SUBMIT TO. THE AUTHORITY A PLAN WITH ROAD AND LOT LAYOUT, THE WATER MAIN. DISTRIBUTION SYSTEM, ELEVATION INFORMATION WITHIN THE DEVELOPMENT, A SECTION TIE, AND ANY OTHER INFORMATION THAT MAY PERTAIN TO THIS. DEVELOPMENT. IF THE DEVELOPMENT IS MORE THAN ONE PHASE, YOU WILL. NEED TO SUPPLY THE AUTHORITY WITH AN OVERALL MASTER PLAN TO MODEL. AND REVIEW THE ENTIRE PROPOSED DEVELOPMENT. DEVELOPMENTS ASKING FOR WATER SERVICE ARE REQUIRED TO HAVE A. HYDRAULIC ANALYSIS AND A REVIEW OF THE PROPOSED DEVELOPMENT. THE. DEVELOPMENT, WHEN MODELED, SHALL HAVE: 1. A FIRE FLOW OF 750 GALLONS PER MINUTE OR ABOVE FOR THE.
the information provided in this packet is to inform developers, engineers and other interested parties of the specifications and steps needed for water line installation and approval for service
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}