Riprap Installation Guide 185 rocks less than 1030mmAll 100 rocks less than 1220mm15 rocks bigger than 1030mm50 rocks less than 715mm50 rocks bigger than 715mm15 rocks less than 330mm85 rocks bigger than 330mmGranular lter ornon-woven geotextile lter fabric, depth below silty water with: survey rod backhoe bucketMaintain design cut slopeKnownwater elev.(measured fromsurvey points)* L speci ed apron lengthNominal thickness* Check H as placement proceeds (Table 1)Ensure a well graded matrix representative of all sizes in the speci ed class (Tables 205-A and 205-B)Top of Riprap design H. W. control points forlayout will be providedon the design toe key and apronto speci ed design elevationsTable 1: Riprap Horizontal DimensionsClass of Riprap (kg) Nominal Riprap Thickness(mm)Surface Width, H(mm)2H : 1V : 1V Slope10350783631254501006811505501230992 1007001566126225010002236180350012002684 2163100015003355270420002000447336064000 250055914507 Table 205-A: Gradation of Rock Sizes in Each Class of Riprap Mass (kg)Class of Riprap (kg) Nominal Riprap Thickness(mm)Rock Gradation Percentage Smaller Than Given Rock Mass (kg)15%50%85% 205-B: Approximate Average Dimension of Each Specified Rock Class Mass (Sg= ) Equivalent Diameter (mm)Class of Riprap (kg) Approximate Average Dimension (mm)15%50%85%<100%1090195280330251202603 80450501
Riprap Installation Guide – 1 85 rocks less than 1030mm All 100 rocks less than 1220mm 15 rocks bigger than 1030mm 50 rocks less than 715mm 50 rocks bigger than 715mm 15 rocks less than 330mm 85 rocks bigger than 330mm Granular ˜lter or non-woven geotextile ˜lter fabric, typ. Measure depth below silty water with: – survey rod – backhoe ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}