Transcription of RR942 - Safety culture on the Olympic Park
{{id}} {{{paragraph}}}
Health and Safety Executive Safety culture on the Olympic park Prepared by the Health and Safety Laboratory for the Health and Safety Executive 2012 RR942 Research Report Health and Safety Executive Safety culture on the Olympic park Nicola Healey & Caroline Sugden Health and Safety Laboratory Harpur Hill Buxton Derbyshire SK17 9JN Preparations for hosting the London 2012 Olympic Games and Paralympic Games have involved large scale construction programmes to deliver new venues and fit out existing buildings and infrastructure. The Health and Safety Executive (HSE), as the Government s independent regulator for work related health and Safety issues, wanted the 2012 Games to drive improvements in health, Safety and welfare standards in the construction industry.
Health and Safety Executive Safety culture on the Olympic Park Prepared by the Health and Safety Laboratory for the Health and Safety Executive 2012
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
London 2012: The Construction Design and, London 2012: The Construction (Design and Management) Regulations, CLASSIFICATION, Construction, 2012 London, 2012, The Tower of London, The Tower of London The Tower of London, The construction, Monday 30 April 2012, London, Design, Index and glossary, 2012 INTERNATIONAL BUILDING CODE HANDBOOK, 2012 INTERNATIONAL BUILDING CODE ® HANDBOOK, And Benefits of Modular construction, Guidance on Air Quality Monitoring, Vicinity of Demolition and Construction, Standard drawings for sewer and water