Transcription of S2 Security Corporation NetBox™ Installation Guide
{{id}} {{{paragraph}}}
S2 Security Corporation NetBox . Installation Guide Version S2 Security Corporation 6 Abbott Road Wellesley, MA 02481. UL Listing UL 294 listing for the S2 NetBox is pending. Note to Installers Install according to national and local codes and use only UL listed equipment. FCC Notice The S2 NetBox complies with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the device is operated in a commercial environment. This equipment generates and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at their expense. The S2 NetBox complies with FCC Class B operation if a full loop ferrite bead ( Fair Rite PN: 0443164151 or equivalent) is used on the external Ethernet cable.
The Node in turn communicates with the Network Controller over the on-board IP network. Power Requirements If AC power is supplied the NetBox requires 100-240V AC 50-60 Hz. If DC power is supplied Controller/Node Blades must be powered with 12V DC at a minimum of 3 amps. Power should come from a separate circuit with its own breaker and an isolated
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}