Transcription of Safety at Alcoa – Programs that Work - ETEBA
{{id}} {{{paragraph}}}
Safety at Alcoa Programs that work Oak Ridge Business Safety Forum 1 December 11, 2013 Metrics Lagging Indicators 2 TRDARTF atality Prevention Process 3 Dept Safety Committees Review Topic and Physically Verify LOP are in Place Rigging Safety Hazard Dropped Load, body part crushed by load Layers of Protection Hierarchy of Controls All personnel responsible for rigging loads must attend rigging training Administrative Inspect all sling equipment before each use Administrative Understand load capacity and select the right type of rigging equipment (wire rope, chain .)and correct capacity Administrative Determine the center of gravity of load and apply rigging so each leg carries an equal share of the load Administrative Do not position hands and fingers between sling and load or load and fixed object Administrative Do not stand or work in the VDZ Administrative Use a spotter, hand signals or other means to clearly communicate load movement Administrative Identify operator work zones (signs/paint floor) that are clear of drop zone or flight path Warning Device Use hands free equipment (tagline, rods, hand holds ) to guide load into place Safety Device Fatality Prevention/Incident Prevention 6 Leadership Visibility AND Risk Recognition Review All Items Monthly with Lead Team Lead Team Verifies LOP Lead Team Walk through Select Random Area HK, Compliance, HP Observation Observatio
Safety at Alcoa – Programs that Work Oak Ridge Business Safety Forum 1 December 11, 2013
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Work Zone Access and Egress, Safety, The Safety, Health and Welfare, Work, General Application) Regulations, Zone, Zone Management within the Victorian Electricity Supply Industry, Work Zones & ADA Compliance, New York City, Select Edition TITLE LIST • Enterthis year, Virginia work area protection manual, Virginia department of transportation