Transcription of SAMPLE ESTIMATE REPORT - Intellibuild
{{id}} {{{paragraph}}}
CK2001/003543/23 Member: JG Steyn SAMPLE ESTIMATE REPORT Project: _____ Client: _____ Tel: _____ Branch: _____ Estimator: _____ Tel: _____ TERMS AND conditions : 1. Please note that this is not a Quote, but an ESTIMATE of Building Material and Labour that will be required to complete your project. Please contact your local Builders Merchant for valid prices before ordering. 2. Labour prices quoted are as provided by Merkel s and updated every 3 months, a standard price file for the region in which construction will take place will be used when estimating prices. 3. During the calculation of quantities every care was taken to assure accuracy, but Intellibuild or any of our Employees will not be held liable for any shortfall or surplus of actual material usage vs this ESTIMATE . 4. Intellibuild will not be held liable for errors and omissions, all quantities are calculated from information collected from building plans and accuracy will rely on the quality and standard of the building plans submitted.
TERMS AND CONDITIONS: 1. Please note that this is not a Quote, but an Estimate of Building Material and Labour that will be required to complete your project.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, Cost, CHAPTER 4 COST OF CONSTRUCTION LABOR AND, General, Changed Circumstance TRID Loan Estimate, Estimate Changed Circumstance TRID Loan Estimate, APPENDIX D - Cost Analysis, APPENDIX D COST ANALYSIS, Cost Reduction, Cost Estimating Manual for Projects, Cost calculation methods