PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

SDD 15C08-a Longitudinal Marking (Mainline)

4"2" " " EDGE LINE (WHITE)4" EDGE LINE (WHITE)EDGE OF TRAFFIC LANEEDGE OF TRAFFIC LANEEDGE OF TRAFFIC LANE3"4"6"CENTER LINETEMPORARY PAVEMENT MARKINGTWO WAY TRAFFICONE WAY TRAFFICTWO WAY TRAFFICONE WAY TRAFFICPERMANENT PAVEMENT MARKING4" EDGE LINE (WHITE)4" EDGE LINE (YELLOW)4" CENTER LINE(YELLOW)GENERAL NOTESDETAILS OF CONSTRUCTION NO SHOWN ON THIS DRAWING SHALL CONFORMTO STANDARD SPECIFICATIONS AND SPECIAL THE NO PASSING ZONE W14-3 SIGN WITH 50 FEET OF THE "T" MARKINGMEASURE FROM EDGE OF Marking TO JOINT LINE. THIS DOES NOT INCLUDESPACE NEEDED FOR GROOVING "4"50'12 12'6"CENTER LINE4" CENTER LINE(YELLOW)LANE LINEMARKING (WHITE)NOTE: ALWAYS LEFTOF CENTER LINEIN THE DIRECTIONOF TRAFFIC2 NOTE: TYPICALLYLEFT OF CENTERLINE IN THEDIRECTIONOF TRAFFIC12 12'JOINT LINE50'4'50'4'50'3"3"LEGEND"T" MA

SDD 15C8 Pavement Marking sheet "a" (mainline) is required. Design Notes: Same day permanent pavement marking quantity includes only centerline and No Passing marking. All other markings are measured and paid for under the appropriate standard permanent pavement marking items.

Tags:

  Design, Marking

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of SDD 15C08-a Longitudinal Marking (Mainline)

Related search queries