SECTION 15183 - REFRIGERANT PIPING

October 15, 2001 CONSTRUCTION STANDARD SPECIFICATION SECTION 15183 REFRIGERANT SYSTEMS PART 1 - GENERAL Quality PART 2 - PRODUCTS Copper Tube And REFRIGERANT PIPING PART 3 - EXECUTION System Design PIPING Hangers And Anchors:..8 Brazed Joints:..9 Leak Testing Of Refrigeration PIPING Evacuation And Vibration Test And 15183 - 1 REFRIGERANT PIPING October 15, 2001 CONSTRUCTION STANDARD SPECIFICATION SECTION 15183 REFRIGERANT SYSTEMS PART 1 - GENERAL SUMMARY A. Materials and operations required for the installation of built-up and packaged split system refrigeration systems, including PIPING , fittings, equipment, refrigeration ac-cessories, refrigerants, and lubricating oil, joints, testing, evacuation and charging, and vibration isolators.

D. When pre-charged, coiled tubing is furnished with split system, the excess tubing shall be coiled and placed out of view. E. Arrange piping to allow inspection and service of compressor and other equipment. Install valves and specialties …

Loading..

Tags:

  Section, Refrigerant, Tubing, Coiled, Coiled tubing, 11853, Section 15183 refrigerant

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of SECTION 15183 - REFRIGERANT PIPING

Related search queries