Transcription of SECTION 15950 - TESTING, ADJUSTING, AND …
{{id}} {{{paragraph}}}
I SECTION 15950 - testing , adjusting , and balancing part 1 - GENERAL RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this SECTION . This SECTION includes testing , adjusting and balancing (TAB) to produce design flows for the following: 1. Air Systems: a. Constant-volume air systems. b. Dual-duct systems. c. Variable-air-volume systems. d. Multizone systems. e. Induction-unit systems. 2. Hydronic Systems a. Constant-flow systems b. Variable-flow systems c. Primary-secondary systems 3.
I SECTION 15950 - TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Volume 5 Section 2 Part, DMRB VOLUME 7 SECTION 5 PART 1, Volume, Section 5, Part 1, Barber Book New Section 5, SECTION 1, PART 5, Section, IT Infrastructure Technical Framework Volume, IT Infrastructure Technical Framework, Volume 2b, Part, Part 12 Excise duties, reliefs, drawbacks, Volume 1 Part, Volume Seventeen, Issue Six September 2014