Example: confidence
Section 6 - Loading/Unloading Rules, Regulations & Charges
Jul 01, 2006 · a single lift shall be at a rate equal to the actual cost of labor/material plus 15 percent, and the prevailing equipment rental rate, and the cost of all-risk insurance, plus 15 percent. E. Self-propelled units, per unit..... $ 250.00 F. All THC for project cargos will be a minimum for $650 per bill of lading.
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: