Design Guidelines and Standards Manual9/16/96 University of CincinnatiSEQUENCE OF OPERATION15985 - 1 SECTION 15985 - Sequence OF Sequence of Operation to be submitted with shop drawing submittal of Section 2 - HVAC with controls shall be installed and programmed to perform as described in this section,and as applicable to the specific 3 - OF , (S/S) AHU1. With the H-O-A switch on the starter panel, in the H position, the system shall be energizedand the system safety devices shall protect the With the H-O-A switch on the starter panel in the "H" position, the unit will With the H-O-A switch in the "A" position, the unit will operate in response to DDC controland system safety Programsa. Schedule5. Control PointsAIAOBIBOa. Start/Stop Xb. Start (OST), AHU1. Scheduled start time, controlled by the DDC controller, can be altered by controllers optimumstart program The result of the calculation is to compute the equipment start time so that the spacetemperature can be moved from its unoccupied mode setting, to the occupied mode setting forthe space controlled, early enough to meet the scheduled start time for the Programsa.
K. Supply Air Temperature (SAT) Control, AHU. 1. SAT setpoint established by DDC controller (usually 55°F). or 1. SAT reset based on requirements of individual terminal box with the most cooling requirement (i.e. zone temperature with most deviation to high side of setpoint). or 1. SAT is reset down until all zone temperatures are satisfied.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Chilled, Water, High, The chilled, Water temperature, Supply, The chilled water supply temperature, Chilled water, Supply Chilled Water, Chilled-Water System, Trane, Temperature, Plan Symbols, Water supply, Chilled water supply, Applications Engineering Manual, Water temper ature, HVAC, The chilled water, The chilled water supply