Transcription of SPECIFICATION STANDARD GROUNDING AND …
{{id}} {{{paragraph}}}
SPECIFICATION STANDARD . GROUNDING AND bonding 27 05 26. PART 1: GENERAL. SCOPE OF WORK. A. The GROUNDING and bonding system refers to all electrodes required by NEC, as well as including made, supplementary, information technology and telecommunications system GROUNDING electrodes B. Provide all labor, materials, tools, installation equipment, and test equipment required for the complete installation of GROUNDING and bonding for fore mentioned systems within the structure. C. The Design Team and/or Contractor are held responsible to be familiar with the provisions contained herein and with other Sections of this SPECIFICATION as applicable to the completion of the installation. The approved vendor, designated agent or employee is responsible to be familiar with the provisions contained herein and is assumed to posses the knowledge, manpower, and material applicable to completion of the installation.
SPECIFICATION STANDARD GROUNDING AND BONDING 27 05 26 The University of New Mexico 802 Yale Blvd. NE Albuquerque, NM 87131-0001 Phone: 505.277.1111 www.unm.edu/its February 23, 2010Page 2 of 9
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Aruba SFP Optical Modules, Fiber, 100G SWDM4 MSA Technical Specifications, 100G SWDM4 MSA Technical Specifications Optical, PASSIVE OPTICAL SPLITTER, Specification Standards Communications, Specification Standards Communications Underground Ducts, FIBER OPTIC CABLES, Optical, 100G PSM4 Specification, UniCam High-Performance Connectors,, UniCam® High-Performance Connectors, Multimode and Single, SPECIFICATION, ELIO