Specifications and Installation Guide for Underground Service to Residential Developments June 2010 Western Massachusetts Electric TABLE OF CONTENTS I. II. General a. , 5 b. Code c. Environmental d. Customer III. Division Responsibility a. The b. WMECO IV. Construction V. Construction Requirements a. Layout and b. , 7 c. VI. VII. VIII. Single-Phase mounted Transformer IX. Secondary Vault (Hand hole)..9, 10 X. Riser XI. XII. Street XIII. Other Reviewed and Updated June 2010 2 Required Lead Times The following lead times should be adhered to in order to facilitate timely completion of your proposed project Design lead time: 8 weeks After the Company receives all required materials (town approved plot plan, loads, easement information, street light layout, etc.) Inspection: 3 working days This is the time required to schedule a company inspector to check the construction.

electrical grade schedule 40 as per NEMA TC2-1990. c. Sweeps used at house or pole risers shall have a minimum radius of 24 inches, with 36 inches preferred. Minimum 48-inch radius sweeps are required within the conduit run. d. Reverse bends shall not be allowed within the conduit run. e. Conduit shall enter concrete vault perpendicular to the ...

Loading..

Tags:

  Name

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Specifications and Installation Guide

Related search queries