SEWER LIFT STATION SPECIFICATIONS AND STANDARD DRAWINGS ENGINEERING DIVISION 33 EAST BROADWAY AVENUE, SUITE 200 MERIDIAN, ID 83642 July 2018 TABLE OF CONTENTS PREFACE CITY engineer S LETTER SECTION 512 - SEWER LIFT STATION CONSTRUCTION PART 1 - GENERAL Section Includes .. 1 Related ISPWC Divisions .. 1 References .. 2 Submittals .. 2 Project Record Documents .. 3 Permits, Fees, and Inspections .. 4 PART 2 - MATERIALS Wet Well .. 4 Discharge Manhole .. 5 Access Doors .. 5 Pumps .. 6 Submersible Chopper Pump .. 7 Pumping System Components .. 9 Pipe and Fittings .. 10 Valves.
4. Field changes of dimension and detail. 5. Details not on original approved Contract Drawings. 6. Product substitutions or alternates utilized. Submit a CD and hardcopy of Final record drawings, O&M Manuals and other documents to Design Engineer and Public Works Department with written request for final approval and acceptance.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}