Transcription of SPECIFICATIONS FOR ERECTION OF STRUCTURAL …
{{id}} {{{paragraph}}}
March 2010 specification 1061 (I) Page 1 of 8 Manitoba Infrastructure and Transportation SPECIFICATIONS FOR ERECTION OF STRUCTURAL STEEL DESCRIPTION The Work shall consist of: .1 Unloading and erecting STRUCTURAL steel components ( girders, diaphragms, jacking beams, stiffeners, girder coverplating) as shown and described on the Drawings and in this specification ; .2 Supplying and installing bearings, including grout pads (where applicable); .3 Design, supply, fabrication, installation, maintenance and removal of temporary falsework (where applicable); .4 Design, supply, delivery, installation, maintenance and removal of ERECTION bracing, temporary wind bracing, lateral stability bracing, longitudinal ties and other temporary works for STRUCTURAL steel girders; and .5 The quality control (QC) testing of all materials and the Work. The Contractor shall not erect the STRUCTURAL steel girders until the substructure concrete has cured a minimum of seven days and achieved 80% of the 28 day specified concrete strength requirements.
March 2010 Specification 1061 (I) Page 1 of 8 Manitoba Infrastructure and Transportation SPECIFICATIONS FOR ERECTION OF STRUCTURAL STEEL
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}