November 2018 Version 3 1 Replace with operator logo and picture of asset Standard Decommissioning Programme(s) Template (Non-Derogation) Insert date Consultaion/pre-draft 2 Document Control Insert Tables of Document Revisions. Approvals Name Signature Date Prepared by Reviewed by Approved by Revision Control Revision No Reference Changes/Comments Issue Date Distribution List Name Company No of Copies 3 Contents Note: Annotate the Contents table to indicate which sections refer to installation or pipeline programmes or both. INST = Installations PL = Pipelines Delete options and brackets where appropriate.
Wellhead protection frames will be removed by HLV or crane vessel with crane (or N/A if none present or pipeline(s) only programme) To remove all seabed structures and leave a clear seabed Wellhead protection frames will be removed along with the top sections of piles. Piles for wellhead protection structures will be removed to -3 metres. 4.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}