Transcription of Standard Detail Drawing Specifications
{{id}} {{{paragraph}}}
AB 6"MIN6"MIN12"MINGROUND OR PAVEMENT SURFACESHEATHING AS REQUIRED BY PLAN, Specifications OR WISCONSINADMINISTRATIVE CODESEE Specifications FOR FILL MATERIALCOVER MATERIALBEDDING MATERIAL TO BE PLACED BEFORESETTING PIPE:x4" MIN UNDER BARRELx3" MIN UNDER BELLA = BEDDING MATERIAL LIMITS FOR PVC,CORRUGATED POLYETHYLENE, POLYPROPYLENE& POLYMER MORTAR PIPEB = BEDDING LIMITS FOR CONCRETE PIPEBELL AND SPIGOT JOINT SHOWN3" CRUSHED AGGREGATE BASE REQUIRED IN WETTRENCH. COST TO BE INCIDENTAL TO SEWERINSTALLATIONTONGUE AND GROOVE CROSS SECTION(EXAGGERATED)BELL AND SPIGOT CROSS SECTION(EXAGGERATED)DRY TRENCHWET TRENCHDRY TRENCHWET TRENCHREVISED 02/27/14 BY NWJ:\CITYDWG\Civil 3D Drawings\DTL\City SDDs\TRENCH SECTION SECTION (TYPICAL)SCALE 1" = 1'CONCRETEPAVEMENTASPHALTOVERLAYASPHALT PAVEMENT,CONCRETE PAVEMENT ORCONCRETE BASEEXISTING GROUNDEXISTING GROUNDPIPESTANDARD TRENCH SECTION ASREQUIRED BY PLANS ANDSPECIFICATIONSPAVEMENT S
water utility fond du lac county, wisconsin project standard details for water main construction title drawn job no.e101-54.01detail no. checked mwdate 3/29/2010 js standard hydrant with pvc water main s-15 main trench 6" gate valve & box hydrant drain rock 19 3/4" (typ.) bedding material 2" x 10" x 15" wood blocking concrete thrust block ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}