Transcription of Standard Operating Procedures: Sewer Treatment ...
{{id}} {{{paragraph}}}
Standard Operating procedures : Sewer Treatment & Collection Systems Tammany Utilities TU Staff Contents SOP 3. Glossary .. 3. Sewer Treatment & Collection System Management Plan Goals .. 4. TU Personnel Responsible for Implementation of this SOP .. 5. Routine Operation of wastewater Treatment 7. Collection System Inspection and Condition Assessment .. 8. Sewer Lift Station Operation and Maintenance .. 9. Illegal Tie-in/Tampering/Service Line Break .. 10. Contingency Equipment and Replacement Inventories .. 11. Sanitary Sewer Overflows .. 12. 2|Page SOP Forms All forms associated with this SOP can be found in the attachments Glossary ADESO Assistant Director of Environmental Services Operations (Tim Brown). Director Director of Environmental Services (Greg Gorden). DMR Discharge Monitoring Report ECC Environmental Compliance Coordinator (Darryl Paulette).
Sewer Treatment & Collection System Management Plan Goals 1. Maintain and improve the condition of the wastewater treatment and collection system infrastructure in order to provide reliable service into the future; 2. To properly manage, operate, and maintain all parts of the wastewater treatment and collection system; 3.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}