Transcription of STANDARD PROCUREMENT DOCUMENTS - …
{{id}} {{{paragraph}}}
1 STANDARD PROCUREMENT DOCUMENTS User s Guide for Prequalification Document for PROCUREMENT of Works Caribbean Development Bank September 2007 introduction User s Guide 2 introduction The STANDARD Prequalification Document for PROCUREMENT of Works (SPD) and User s Guide have been designed to: (i) simplify the Employer s preparation of a specific Prequalification Document (PQD) for PROCUREMENT of Works; (ii) reduce the Applicants preparation time and effort; and (iii) facilitate and simplify the Employer s evaluation of applications; and (iv) minimize CDB s time required for the prior review of the PQD The purpose of the Users Guide (the Guide) is to provide guidance to Employers on how to prepare prequalification DOCUMENTS for works based on the STANDARD PROCUREMENT document. In addition the Guide includes guidance on how to prepare the Invitation for Prequalification (IFP). The provisions in Section I, Instructions to Applicants (ITA) of the SPD must be used without any modification to its text or format.
Introduction User’s Guide 7 contractor normally usually perform contract construction work directly, but manages the work of other (sub)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}