Transcription of STANDARD SEWER AND WATER MAIN SPECIFICATIONS
{{id}} {{{paragraph}}}
Revised: July 1, 2014; Purnima Dharia, William Patalano THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER AND SEWER OPERATIONS STANDARD SEWER AND WATER MAIN SPECIFICATIONS JULY 1, 2014 Revised: July 1, 2014; Purnima Dharia, William Patalano NO TEXT ON THIS PAGE Revised: July 1, 2014; Purnima Dharia, William Patalano i TABLE OF CONTENTS DIVISION I GENERAL PROVISIONS Section 10 Definitions And General Provisions I-3 Definition Of Terms I-3 Sewers, WATER Mains, Etc., To Be Built As Shown On The Contract Plans I-3 Means And Methods Of Construction I-4 Hours Of Work I-4 Adjusting Existing Pavements, Sidewalks, Etc. I-5 Tree Preservation, Protection, Removal And replacement I-5 Encumbrances I-6 Disposal Of Excess Excavated Material I-6 Lines And Grades (Contractor s Survey Party) I-6 Preservation Of Points, Stakes, Etc.
51.22 Reconstruction of Existing Manholes V-83 51.23 Replacement Of Existing Manhole Frame And Cover V-85 51.31 Drop-Pipe Manholes V-87 51.41 Catch Basins V-93 51.42 Incremental Cost Of (Standard Type 3 Or Other Kind And Number) Catch V-99 Basin In Lieu Of (Standard Type 1 Or Standard Type 2 Or Other Kind And Number) Catch Basin
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}