Transcription of STANDARD SEWER AND WATER MAIN SPECIFICATIONS
{{id}} {{{paragraph}}}
Revised: July 1, 2014; Purnima Dharia, William Patalano THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER AND SEWER OPERATIONS STANDARD SEWER AND WATER MAIN SPECIFICATIONS JULY 1, 2014 Revised: July 1, 2014; Purnima Dharia, William Patalano NO TEXT ON THIS PAGE Revised: July 1, 2014; Purnima Dharia, William Patalano i TABLE OF CONTENTS DIVISION I GENERAL PROVISIONS Section 10 Definitions And General Provisions I-3 Definition Of Terms I-3 Sewers, WATER Mains, Etc., To Be Built As Shown On The Contract Plans I-3 Means And Methods Of Construction I-4 Hours Of Work I-4 Adjusting Existing Pavements, Sidewalks, Etc. I-5 Tree Preservation, Protection, Removal And Replacement I-5 Encumbrances I-6 Disposal Of Excess Excavated Material I-6 Lines And Grades (Contractor s Survey Party) I-6 Preservation Of Points, Stakes, Etc. I-7 Contractor Not To Disturb City Monuments I-7 Right To Construct Sewers, WATER Mains, House Connections, Etc.
Gate Valves With Various End Connections And 3-Inch Through 12-Inch Tapping Valves (Section 2.05) ... Delivering And Installing Pipe-To-Wall Penetration Seal VI-76 65.51 Furnishing And Placing Concrete VI-78 65.61 Furnishing, Delivering And Placing Structural, Reinforcing And VI …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}