STANDARD TECHNICAL SPECIFICATION FOR MAIN PLANT PACKAGE OF SUB- CRITICAL THERMAL POWER PROJECT 2x (500 MW OR ABOVE) Government of India Ministry of Power Central Electricity Authority New Delhi SEPTEMBER, 2008 RAKESH NATH Chairperson Central Electricity Authority & Ex-officio Secretary Government of India F O R E W O R D An unprecedented growth is being witnessed by the power sector with a capacity addition of over 78,000 MW envisaged during 11th Plan and about 80,000 MW in 12th Plan. A programme of this magnitude requires that every possible opportunity for enhancing pace of capacity addition is explored and fully exploited.
2.1.23 Coal firing system 2- 14 2.1.24 Fuel oil preparation and firing system 2- 17 2.1.25 Draft plant 2- 18 2.1.26 Flue gas ducts and air ducts 2- 20 2.1.27 Electrostatic precipitator design data 2- 21 2.2 Technical Requirements 2- 24 2.2.1 Steam generator enclosure 2- 24 2.2.2 Super heaters and reheaters 2- 30
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}