Transcription of STANDARD WORK PROCEDURE FOR CFA - Amplus …
{{id}} {{{paragraph}}}
Amplus Ltd Foundation and Geotechnical Specialists Amplus LTD QUALITY SYSTEM Contract No: Page: 1 of 4 Issue Date: Approved By: GNH STANDARD work PROCEDURE FOR CFA PILING PRELIMINARIES Works Supervisor shall confirm that the access, piling platform, attendances, details of underground services and protection, as provided by the Main Contractor, are satisfied. If not he shall inform the Main Contractor (using CVI/RFI form) and obtain instructions in writing. Agree sequence of work with Main Contractor. H Works Supervisor For contracts where Amplus Ltd are responsible for the design, the piling will not commence until a pile schedule has been prepared. This is to be approved and signed by the Design Engineer. In addition the pile design and schedule shall be submitted to the client and approval requested.
Amplus Ltd Foundation and Geotechnical Specialists AMPLUS LTD QUALITY SYSTEM STANDARD WORK PROCEDURE FOR CFA PILING Contract No: Page: 3 of 4
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}