PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: stock market

STORAGE, STACKING AND HANDLING PRACTICES

Part 7 Construction PRACTICES and Safety 7- 13 Chapter 2 storage , STACKING AND HANDLING PRACTICES GENERAL PRACTICES General Requirements and Restrictions on storage and HANDLING Materials required in construction operations shall be stored, and handled in a manner to prevent deterioration and damage to the materials, ensure safety of workmen in HANDLING operations and non-interference with public life including safety of public, prevention of damage to public property and natural environment.

forth in this Code so as to ensure desire safety during storage. Stacks shall not be piled so high as to make them unstable under fire fighting conditi ons and in general they shall not be more than 4.5 m in height. Materials which are likely to be affected by subsidence of soil like precast beams, slabs and timber of sizes shall

Loading..

Tags:

  High, Storage, Piled

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of STORAGE, STACKING AND HANDLING PRACTICES

Related search queries