Transcription of SUBJECT: Pipe Installation Specifications …
{{id}} {{{paragraph}}}
June 16, 2005. SECTION 15010. GENERAL REQUIREMENTS, MECHANICAL. A. GENERAL. 1. All piping entering the Shipyard must be controlled per Shipyard Standard Procedure # 2. All piping shall be in accordance with Facilities Department instruction # 508-006. GENERAL DYNAMICS. Electric Boat ___FACILITIES__ DEPARTMENT INSTRUCTION. DEPT. NAME. subject : pipe Installation Specifications APPLICABILITY: Groton Shipyard SUPERSEDES EFFECTIVE PAGE REV NUMBER. - DATE: 06/10/05 B 508-006. 1 OF 1. All piping (new, repairs, modification, etc.) shall be installed according to the following: Attachment # 1: Air Low Pressure Attachment # 2: Air High Pressure Attachment # 3: Argon Attachment # 4: Carbon Dioxide Attachment # 5: C-5.
June 16, 2005 DIVISION 15 - 2 SECTION 15015 16 May 2005 Department Instruction 508 -006: Pipe Installation Specifications Attachment #1: Air-Low Pressure
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}