PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

SUBSIDY HOUSING TYPOLOGY AND COSTS STUDY: …

SUBSIDY HOUSING TYPOLOGY AND COSTS STUDY: deliverable 1 PART 3:BILL OF QUANTITIES FOR MILITARY VETERAN s UNITM ilitary Veterans UnitType 2- 50m UnitQuantityRateAmountEARTHWORKSSECTION NO. 2 Builders WorkBILL NO. 1 EARTHWORKS (PROVISIONAL)The Tenderer is referred to the relevant Clauses in the separate document Model Preambles for Trades (2008 Edition) and the Supplementary Preambles PREAMBLESC arting away of excavated material:Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building CLEARANCE, clearance, etc.:Digging up and removing rubbish, debris, vegetation, hedges, shrubs, bush, etc and trees not exceeding 200mm ,125250T2250 Strip average 150mm thick layer of topsoil and stockpile on ,545250T2250 EXCAVATION, FILLING, ETC. OTHER THAN BULKE xcavation in earth not exceeding 2m deep:Trenches average 800mm deep, including risk of collapse and keeping excavations free of over all excavations for carting away:Surplus material from excavations and/or stock piles on site to a dumping site to be located by the No.

subsidy housing typology and costs study: deliverable 1 part 3:bill of quantities for military veteran’s unit

Tags:

  Deliverable

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of SUBSIDY HOUSING TYPOLOGY AND COSTS STUDY: …

Related search queries