PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

Substation Civil Design and Construction Standard

TasmanianNetworksPtyLtd(ABN24167357299)S tandardSubstationCivilDesignandConstruct ion ,June2018 TasmanianNetworksPtyLtd(ABN24167357299)A uthorisationsActionName and titleDatePrepared byMichaelVerrier SeniorAssetStrategy EngineerJune 2018 Reviewed bySantoshDhakal Asset EngineerJune 2018 Authorised byDarrylMunro AssetStrategyTeam LeaderJune 2018 Reviewcycle30 monthsResponsibilitiesThisdocumentisther esponsibilityof theAsset StrategyTeam,TasmanianNetworksPtyLtd, ABN 24 167 357 299(hereafterreferredtoas "TasNetworks").PleasecontacttheAssetStra tegyLeader withanyqueriesor suggestions. ImplementationAllTasNetworks staffand contractors. ComplianceAll group RequirementsTherequirementssetoutinTasNe tworks documentsareminimumrequirementsthatmustb ecompliedwithbyallTasNetworksteam members, contractors,andother document.

unfavourable combination of static, dynamic wind, snow, ice and earthquake loadings. Loadings must be based on the relevant parts of AS/NZS€1170. Ultimate limit state wind speeds must be based on a 50 year return period (i.e. 2% probability of being exceeded in any one year) as per AS/NZS€1170.2. 2.3 Earthing and electrical bonding

Tags:

  Static

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Substation Civil Design and Construction Standard

Related search queries