PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: confidence

SUBSTRATE REQUIREMENTS - CHEMBOND

Properly preparing a SUBSTRATE is one of the most importantsteps in a tile best installation is only as goodas the SUBSTRATE beneath the time to properly prepare a SUBSTRATE and address job-site conditions should be a priority. For best results, see individual ChembondProduct Data Sheets and this document for SUBSTRATE environmental conditions and protect workduring and after the installation. Comply with trade andindustry standards as well as the manufacturer's necessary,build a temporary shelter and use indirect auxiliary heaters to maintain an adequate temperature within the working environment and onthe installation temporary heaters to the exterior to preventdamage to the installation, or injury to personnel fromcarbon monoxide tiled areas,maintain SUBSTRATE and ambient temperatures at no less than 10 C (50 F) and no greater than 35 C (95 F) during installation and for atleast 7 days after completion, unless otherwise indicatedin the product instructions and/or ANSI A108 ExaminationBefore work commences, examine the areas to be coveredand report any deficiency or adverse condition in writing to the general contractor,owner, developer or not proceed with work until surfaces and conditionscomply with REQUIREMENTS indicated in the manufacturer's instructions and in ANSI A108.

•Leave a gap of 6 mm (1/4") around drainpipes, conduits,posts,columns,and along wall and curb bases. •Stagger (offset) individual sheets of subfloor and underlayment per industry standards.

Loading..

Tags:

  Requirements, Substrates, Substrate requirements, Subfloor

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of SUBSTRATE REQUIREMENTS - CHEMBOND

Related search queries