PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

Technical Notes B on Brick Construction

21 BREVISEDA pril2002designed to stop any mortar droppings from blocking thecavity and allow water to flow around them. Use ofdrainage materials is not required, and in some casesmay contribute to water penetration problems within thewall. More information on drainage materials is pre-sented in Technical Notes21A of this series. Drip Edge/Flashing ExtensionWater that collects on flashing can re-enter the wallbelow if flashing terminates behind the face of the best performance, flashing should be extended 1 4in.(6 mm) beyond the wall plane and turned down at anangle of 45 degrees to form a drip. This forces wateraway from the wall protruding flashing is neither possible nor desirablein some cases.

2 tial for galvanic action between the metals should be considered. Flashing materials should overlap the metal drip edge by a minimum of 1 in. (25 mm), and be fully

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Technical Notes B on Brick Construction

Related search queries