Transcription of Technical Report Thacker Pass - Lithium Americas
{{id}} {{{paragraph}}}
Technical Report on the Pre-Feasibility Study for the Thacker pass project , humboldt county , nevada , USA Effective Date: August 1st, 2018 Prepared by: Reza Ehsani, (Advisian) Louis Fourie, (Advisian) Andrew Hutson, FAusIMM, BE (Mining), (Mining Plus) Daniel Peldiak, (Advisian) Rob Spiering, (Advisian) John Young, ,SME-RM (Great Basin Environmental Services, LLC) Ken Armstrong, P. Eng. (Chemetics Inc.) Advisian Suite 500, 4321 Still Creek Drive Burnaby, BC V5C 6S7 CANADA Phone: +1 604 298 1616 Facsimile: +1 604 298 1625 Lithium Americas Corp. Technical Report on the Pre-Feasibility Study for the Thacker pass project , humboldt county , nevada , USA Advisian i Cautionary Note Regarding Forward-Looking Information Information contained in this Report and the documents referred to herein which are not statements of historical facts, may be forward-looking information for the purposes of Canadian securities l
Lithium Americas Corp. Technical Report on the Pre-Feasibility Study for the Thacker Pass Project, Humboldt County, Nevada, USA Advisian i Cautionary Note Regarding Forward-Looking Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}