Premier -PIPE USA. TECHNICAL SPECIFICATION . CURED-IN-PLACE PIPE. Section Page #. PART 1 GENERAL. THE REQUIREMENT 1. REFERENCE SPECIFICATIONS, CODES AND STANDARDS 1. CONTRACTOR SUBMITTALS 1. QUALITY ASSURANCE 2. WARRANTY 2. PART 2 PRODUCTS. MATERIALS 2. PHYSICAL PROPERTIES 3. PART 3 EXECUTION. PREPARATION 4. INSTALLATION 5. SERVICE LINE RECONNECTION 6. TESTING 6. PART 4 PAYMENT. CURED-IN-PLACE PIPE 7. GROUTING OF SEVER DEFECTS 7. SERVICE LINE RECONNECTIONS 7. Premier -Pipe USA TECHNICAL Specifications Revision 03/08/11.
Premier-Pipe USA Technical Specifications Revision 03/08/11 Page 1 PART 1 – GENERAL 1.01 THE REQUIREMENT A. This specification covers the work necessary to furnish and install complete, cured-in-place pipe (CIPP).