TEMPORARY CELLULAR COFFERDAM design , installation & REMOVAL AT WILLOW ISLAND HYDROELECTRIC PROJECTA technical paper presented by:The Ruhlin Company &Mueser Rutledge Consulting EngineersFirst presented at HydroVision 2014 TEMPORARY CELLULAR COFFERDAM design , installation , AND REMOVAL AT WILLOW ISLAND HYDROELECTRIC PROJECT Page 1 of 43 Michael Ciammaichella, PE James Tantalla, PhD, PE Vice President, Civil Division Manager Associate The Ruhlin Company Mueser Rutledge Consulting Engineers Sharon Center, OH New York, NY USA USA Abstract For a hydroelectric powerhouse to be constructed along the Ohio River at Willow Island, a CELLULAR COFFERDAM was necessary to control ground and surface waters from entering the required 110-foot deep excavation. The Ruhlin Company was contracted to manage the design and construction of the COFFERDAM . Analysis was performed for various load cases ranging from normal pool elevations to flood conditions.
TEMPORARY CELLULAR COFFERDAM DESIGN, INSTALLATION, AND REMOVAL AT WILLOW ISLAND HYDROELECTRIC PROJECT Page 1 of 43 Michael Ciammaichella, PE James Tantalla, PhD, PE
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
The Design, Supply and Installation of Specialist, The design, supply and installation, Environment Monitoring Server Room, Monitoring, Installation, Guidelines for Small Flow Sewage Treatment, Design installation, Small flow sewage treatment facilities, Ground-Fault Relays, 501-123 Fieldbus Wiring Guide