PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: quiz answers

TEMPORARY JUMPER DETAIL NOTES - ircutilities.com

TEMPORARY JUMPER DETAIL NOTESCONTINUED FROM and fittings used for connecting the new pipe to the existing pipe shall be disinfected with liquid chlorineprior to installation in accordance with AWWA C651, LATEST EDITION. The tapping sleeve and exterior ofthe main to be tapped shall be disinfected by spraying or swabbing per AWWA C651 Section Two. The use ofchlorine tablets is strictly JUMPER connection shall also be used to maintain a minimum pressure of 20 PSI in the new mainscontinuously after disinfection and until FDEP clearance letter is Contractor shall provide documentation demonstrating that the Reduced Pressure Zone BackflowPreventer (RPZ) is in good working order at the time of installation, and provide documentation that the RPZhas been tested by a qualified backflow technician as approved by IRCDUS. The Contractor shall have eachRPZ tested prior to use on each as required to flush lines greater than diameter, the tie-in valve shall remain closed and shall belocked in the closed position by the utility company.

TEMPORARY JUMPER DETAIL NOTES CONTINUED FROM W-13 9.Pipe and fittings used for connecting the new pipe to the existing pipe shall be disinfected with liquid chlorine

Loading..

Tags:

  Jumper

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of TEMPORARY JUMPER DETAIL NOTES - ircutilities.com

Related search queries