Transcription of TESTING AND COMMISSIONING PROCEDURE FOR AIR …
{{id}} {{{paragraph}}}
TESTING AND COMMISSIONING PROCEDURE FOR AIR- conditioning , REFRIGERATION, VENTILATION AND CENTRAL MONITORING & CONTROL SYSTEM INSTALLATION IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION 2007 EDITION (INCORPORATING CORRIGENDUM NO. GSAC01) ARCHITECTURAL SERVICES DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PREFACE This TESTING and COMMISSIONING (T & C) PROCEDURE aims to lay down the minimum TESTING and COMMISSIONING requirements to be carried out on air- conditioning , refrigeration, ventilation and central monitoring and control system installation in Government Buildings of the Hong Kong Special Administrative Region (HKSAR). Such requirements are applicable to both new installations upon completion and existing ones after major alteration. The present edition was developed based on its 2007 edition by the Air- conditioning Specialist Support Group that was established under the Building Services Branch Technical Information and Research & Development Committee.
testing and commissioning procedure for air-conditioning, refrigeration, ventilation and central monitoring & control system installation in government buildings
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Commissioning Procedure for, Testing, Commissioning, COMMISSIONING OF HVAC SYSTEMS, Testing procedure, New Construction Building Commissioning Best Practice, Commissioning Summary Template, Austin, Texas, Procedure, HVAC TESTING AND BALANCING commissioning not, Commissioning, Maintenance and Troubleshooting, HVAC Startup, Test & Balance, Commissioning” by, Commissioning Plan --Construction Phase-- A, Commissioning of Fire Alarm Systems, Commissioning of Fire Protection Systems