TESTING AND COMMISSIONING PROCEDURE FOR AIR-CONDITIONING, REFRIGERATION, VENTILATION AND CENTRAL MONITORING & CONTROL SYSTEM INSTALLATION IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION 2007 EDITION (INCORPORATING CORRIGENDUM NO. GSAC01) ARCHITECTURAL SERVICES DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PREFACE This TESTING and COMMISSIONING (T & C) PROCEDURE aims to lay down the minimum TESTING and COMMISSIONING requirements to be carried out on air-conditioning, refrigeration, ventilation and central monitoring and control system installation in Government Buildings of the Hong Kong Special Administrative Region (HKSAR). Such requirements are applicable to both new installations upon completion and existing ones after major alteration.
Testing & Commissioning Procedure Air-conditioning, Refrigeration, Ventilation and Central Monitoring & Control System Installation 1 Introduction The procedures stated in this document cover the activities in preliminary tests and inspections, functional performance tests and the commissioning of newly completed
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}