Transcription of TM 2.3.2 Structure Design Loads R0 090602 - …
{{id}} {{{paragraph}}}
california high - speed Train Project TECHNICAL MEMORANDUM. Structure Design Loads TM Prepared by: Signed document on file_____ _29 May 09_. Tom Jackson, PE Date Checked by: Signed document on file_____ _01 Jun 09_. Vince Jacob, PE Date Approved by: Signed document on file_____ _02 Jun 09_. Ken Jong, PE, Engineering Manager Date Released by: Signed document on file_____ __04 Jun 09_. Anthony Daniels, Program Director Date Revision Date Description 0 02 June 09 Issued for 15% Design ; Initial Release, R0. Prepared by for the california high - speed rail authority california high - speed Train Project Structure Design load , R0. This document has been prepared by Parsons Brinckerhoff for the california high - speed rail authority and for application to the california high - speed Train Project.
California High-Speed Train Project Structure Design Loads, R0 CALIFORNIA HIGH-SPEED RAIL AUTHORITY Page i System Level Technical and Integration Reviews
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}