Transcription of Tools, Installation, Operation, Maintenance
{{id}} {{{paragraph}}}
Tools, Installation, Operation and Maintenance Safe, efficient operation of any product is inherently dependent upon its proper installation. In this section the preparation and assembly of low, medium and high pres- sure connections is explained. Also covered is the assembly procedure for medium and high pressure anti-vibration collet gland assemblies. Correct installation procedures are further promoted by providing dimensional information associated with a variety of Parker Autoclave Engineers tube connections as well as the torque required to properly seat numerous Parker Autoclave Engineers components.
square using a hacksaw or bandsaw (suggest at least 32 teeth per inch minimum) and sawing vice or guide. Deburr external edge with a flat file and the ID of the tube with either the Parker AE deburr tool (p/n 90257) or even the Cone & Thread Reamer tools shown on page 21. Step 2. Lubricate male threads.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}