Torrent Engineering and EquipmentMay-08 Snowmaking Air & Water Piping EstimatorNote: For Budget estimating Purposes OnlyMATERIAL COSTSE stimated Pipe cost ($/LB) $ /LB(Delivered to ski area)New prime ERW steel line pipe, API-5L, Grade X-42 or better WATER PIPING AIR PIPINGUnitUnitNominalWallWeightWaterWall WeightAirSize (Inches)(Inches)(LB/ft)($/FT)(Inches)(LB /ft)($/FT)2" $ $ 3" $ $ 4" $ $ 6" $ $ 8" $ $ 10" $ $ 12" $ $ 14" $ $ 16" $ $ 18" $ $ INSTALLATION COSTSI ncludes unload pipe, move, welding, set in place, tie-inInstall cost $/FT - Each2" $ 3" $ 4" $ 6" $ 8" $ 10" $ 12" $ 14" $ 16" $ 18" $ Trench/Backfill.
Torrent Engineering and Equipment May-08 Snowmaking Air & Water Piping Estimator Note: For Budget Estimating Purposes Only MATERIAL COSTS Estimated Pipe Cost ($/LB) 0.85$ /LB (Delivered to ski area)