Transcription of Torrent Engineering and Equipment
{{id}} {{{paragraph}}}
Torrent Engineering and EquipmentMay-08 Snowmaking Air & Water Piping EstimatorNote: For Budget Estimating Purposes OnlyMATERIAL COSTSE stimated Pipe Cost ($/LB) $ /LB(Delivered to ski area)New prime ERW steel line pipe, API-5L, Grade X-42 or better WATER PIPING AIR PIPINGUnitUnitNominalWallWeightWaterWall WeightAirSize (Inches)(Inches)(LB/ft)($/FT)(Inches)(LB /ft)($/FT)2" $ $ 3" $ $ 4" $ $ 6" $ $ 8" $ $ 10" $ $ 12" $ $ 14" $ $ 16" $ $ 18" $ $ INSTALLATION COSTSI ncludes unload pipe, move, welding, set in place, tie-inInstall Cost$/FT - Each2" $ 3" $ 4" $ 6" $ 8" $ 10" $ 12" $ 14" $ 16" $ 18" $ Trench/Backfill.
Torrent Engineering and Equipment May-08 Snowmaking Air & Water Piping Estimator Note: For Budget Estimating Purposes Only MATERIAL COSTS Estimated Pipe Cost ($/LB) 0.85$ /LB (Delivered to ski area)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Preliminary of Piping and Pipeline Engineering, Engineering, Pipeline Engineering, Discussion Paper for Modifying Pipeline, Discussion Paper for Modifying Pipeline Engineering Standards, Pipeline, Senior Pipeline Designer, Procedures for Preventative Maintenance, Procedures for Preventative Maintenance Treatment, LAUNCHING OF FRONT-END ENGINEERING, LAUNCHING OF FRONT-END ENGINEERING DESIGN FOR, Engineering Design LACT & Pipeline Measurement