Transcription of Traffic Control Inspection Checklist Segment - …
{{id}} {{{paragraph}}}
Page 1 of 8 Traffic Control Inspection Checklist Segment : Simon Contractors Simon Contractors Description Originator: Initials Date Reviewed by: Distribution: Traffic Quality Manager, Site Assistant Traffic Manager of Operations Page 2 of 8 Section Traffic Control Plan Design Requirements Compliant (Y / N / N/A) Comments Posted Speed through detour work zone Is the posted speed in the work area reasonable considering the work activities, equipment movement, revised geometrics, road surface condition, lane and shoulder widths Roadway Surface Have all sections of roadway being utilized by construction vehicles been swept at the end of shift?
Night-time Work – Have the night-time safety considerations been addressed to ensure that the work zone is safe for the travelling public and workers?
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
WORK METHOD STATEMENT, Access, SAFE WORK METHOD STATEMENT – Part 1, SAFE WORK METHOD STATEMENT – Part 1 EARTHWORKS, Design in High‐Rise Construction, Egress, Directive 14 of 1975 Alteration, New York City, Emergency Response to Tactical Law Enforcement, Site specific fall protection plan, Technical Data Greengate Room Controller